Electrical
Workshop automation panel
Central control for six machines: PLC panel, field wiring and commissioning.
- 6 machines
- centrally controlled
- 5 weeks
- design to live
The machines ran independently and output was counted by hand. Once the panel went live, counting became automatic and the shift report started producing itself.