Factory main distribution renewal
Replacing the main distribution board across weekend windows, without stopping production.
- 0 hours
- production downtime
- 3 weekends
- cutover window
- 18%
- loss reduction
The existing board dated from the early 1990s and spare parts were no longer available. The renewal was split across three weekends without halting production; a rollback plan was written before each cutover and used in none of them.